Get in Touch with Didi Land
Design Process Walkthrough Interactive
Click any phase to see deliverables, FAT checklist, and what investor input is needed at that step.
1Concept Brief
23D Design
3Engineering
4Production
5Install
Phase 1 — Concept Brief
Deliverables you receive:- Locked design brief PDF: floor plan, age mix, theme direction, budget tier, MOQ
- Project number assigned for tracking
- Sample 3D concept sketch for budget tier validation
Floor plan PDF, ceiling height (mm), audience age split, theme preference, budget tier (Basic / Mid / Premium), target opening date.
Start Phase 1 brief →
Phase 2 — 3D Design
Deliverables you receive:- AutoCAD layout DWG (industry standard, no proprietary lock-in)
- Lumion MP4 walkthrough video (60–90 seconds)
- High-resolution still renders (4K, theme-coloured)
- Module schedule with module IDs and theme finishes
Up to 3 free revision rounds covering layout adjustments, theme palette tweaks, or feature swaps. Additional revisions priced transparently in the contract.
Request a sample render →
Phase 3 — Engineering
Deliverables you receive:- SolidWorks structural drawings with material schedule
- EN 1176 load calculation report (load-bearing capacity, fall-height surfacing, entrapment geometry)
- Bill of materials (BOM) with steel gauge, foam density, fabric flame rating
- Anchor layout drawings for site preparation
Permit reviewer feedback (if any) and final approval to proceed to factory production.
Discuss engineering scope →
Phase 4 — Production
Deliverables you receive:- Weekly production progress photos and short videos
- FAT (Factory Acceptance Test) report covering ASTM F1487 / EN 1176 load tests
- Pre-shipment inspection video
- Bill of lading and shipping documents
Site preparation begins now: floor levelling, electrical for LED features, drainage if water elements included.
Track factory progress →
Phase 5 — Install & Train
Deliverables you receive:- Overseas installer crew arrival within 14 days of dock-load
- On-site assembly and final safety check
- Operator training session for staff (cleaning, daily inspection, common repairs)
- Operator manual in English plus 5-year warranty registration
- Soft launch support: first-week opening guidance
Site access, lifting equipment scheduling, staff availability for training session.
Schedule installation →
Trending now




