Design Process Walkthrough Interactive

Click any phase to see deliverables, FAT checklist, and what investor input is needed at that step.

1Concept Brief
23D Design
3Engineering
4Production
5Install

Phase 1 — Concept Brief

Duration: 5 working daysRevisions: n/a
Deliverables you receive:
  • Locked design brief PDF: floor plan, age mix, theme direction, budget tier, MOQ
  • Project number assigned for tracking
  • Sample 3D concept sketch for budget tier validation
Investor input required:
Floor plan PDF, ceiling height (mm), audience age split, theme preference, budget tier (Basic / Mid / Premium), target opening date.
Start Phase 1 brief →

Phase 2 — 3D Design

Duration: 2 weeksRevisions: 3 free
Deliverables you receive:
  • AutoCAD layout DWG (industry standard, no proprietary lock-in)
  • Lumion MP4 walkthrough video (60–90 seconds)
  • High-resolution still renders (4K, theme-coloured)
  • Module schedule with module IDs and theme finishes
Investor input required:
Up to 3 free revision rounds covering layout adjustments, theme palette tweaks, or feature swaps. Additional revisions priced transparently in the contract.
Request a sample render →

Phase 3 — Engineering

Duration: 2 weeksRevisions: 1 free
Deliverables you receive:
  • SolidWorks structural drawings with material schedule
  • EN 1176 load calculation report (load-bearing capacity, fall-height surfacing, entrapment geometry)
  • Bill of materials (BOM) with steel gauge, foam density, fabric flame rating
  • Anchor layout drawings for site preparation
Investor input required:
Permit reviewer feedback (if any) and final approval to proceed to factory production.
Discuss engineering scope →

Phase 4 — Production

Duration: 4–6 weeksRevisions: n/a
Deliverables you receive:
  • Weekly production progress photos and short videos
  • FAT (Factory Acceptance Test) report covering ASTM F1487 / EN 1176 load tests
  • Pre-shipment inspection video
  • Bill of lading and shipping documents
Investor input required:
Site preparation begins now: floor levelling, electrical for LED features, drainage if water elements included.
Track factory progress →

Phase 5 — Install & Train

Duration: 1–2 weeks on siteRevisions: n/a
Deliverables you receive:
  • Overseas installer crew arrival within 14 days of dock-load
  • On-site assembly and final safety check
  • Operator training session for staff (cleaning, daily inspection, common repairs)
  • Operator manual in English plus 5-year warranty registration
  • Soft launch support: first-week opening guidance
Investor input required:
Site access, lifting equipment scheduling, staff availability for training session.
Schedule installation →