Get in Touch with Didi Land
By-Industry Capex Estimator — CIF USD by Vertical and Footprint
Calibrated against 600+ Didi Land installations across 40+ countries (2019–2025). Returns CIF USD ranges, plus the 30% rule total landed cost.
Equipment range (CIF, FOB+freight+insurance to port):
Equipment midpoint:
+ Shipping and duties (~17.5%):
+ Installation crew expenses:
+ Site preparation:
+ Year-1 maintenance (~10%):
Total 12-month landed cost:
Estimate based on 2024–2025 RFQ pricing book averages. Actual quote depends on theme complexity, compliance binder scope (e.g. ESSER pivot to Title I docs), shipping mode (FOB / CIF / DDP), and destination market import duties. Hidden cost framework per Koalaplay 2026 industry guide.




